(855) 808-2500
  1. Home
  2. Hardware
  3. Power

IBM hardware · Servers for IBM i, AIX and Linux

Maintenance with zero planned downtime.* Your price in one business day.

For the teams who run IBM i, AIX and Linux: IBM Power11, sized to your workloads by our engineering team and priced before you commit.

One of our engineers replies within one business day.

* IBM’s claim for Power, based upon IBM internal testing of system upgrade scenarios. The conditions are printed below.

IBM Power11 at first lightA line drawing of an IBM Power11 server seen from the front, with its drive bays, vent slats and status lights, standing on the horizon with the sun rising behind it. One light is lit.Power11
IBM Power11 at first lightA line drawing of an IBM Power11 server seen from the front, with its drive bays, vent slats and status lights, standing on the horizon with the sun rising behind it. One light is lit.

Your next Power server can carry more of the upkeep.

  • It runs live updates IBM designed for zero planned downtime.*
  • It keeps immutable, air-gapped copies of your data with IBM Power Cyber Vault.
  • It runs AI next to your data, on AI engines built into the chip.

The servers you run today may be serving you well. This is what Power11 adds.

We size it with you. You see your price first, within one business day.

Keep running through maintenance.

How Power keeps running through maintenanceThree steps on one line. Many updates are applied in place. Some maintenance may require Live Partition Mobility. The result IBM claims is zero planned downtime for system maintenance, based upon IBM internal testing of system upgrade scenarios.01Updates in placeVIOS, hot plug adapters, I/O adapterfirmware and concurrent system firmware.02LPM where neededNon-concurrent firmware and hardwaremaintenance may require Live PartitionMobility.03Zero planneddowntime*IBM's claim for system maintenance,under its internal tests.ZERO PLANNED DOWNTIME FOR SYSTEM MAINTENANCE** IBM's claim for Power, based upon IBM internal testing of system upgrade scenarios. Many updates (VIOS, hot plug adapters, I/O adapter firmware and concurrentsystem firmware updates) can be done in place; some (non-concurrent system firmware and hardware maintenance) may require Live Partition Mobility (LPM) support.Source: IBM, ibm.com/power (page dated October 15, 2026, read October 23, 2026).
How Power keeps running through maintenanceThree steps on one line. Many updates are applied in place. Some maintenance may require Live Partition Mobility. The result IBM claims is zero planned downtime for system maintenance, based upon IBM internal testing of system upgrade scenarios.ZERO PLANNED DOWNTIME*01Updates in placeVIOS, hot plug adapters, I/O adapterand concurrent system firmware.02LPM where neededNon-concurrent firmware and hardwaremaintenance may require LPM.03Zero planneddowntime*IBM's claim for system maintenance,under its internal tests.* IBM's claim for Power, based upon IBMinternal testing of system upgrade scenarios.Many updates (VIOS, hot plug adapters, I/Oadapter firmware and concurrent systemfirmware updates) can be done in place; some(non-concurrent system firmware and hardwaremaintenance) may require Live PartitionMobility (LPM) support.Source: IBM, ibm.com/power (page datedOctober 15, 2026, read October 23, 2026).
IBM says Power is zero planned downtime for system maintenance, based on its internal tests of upgrade scenarios, printed in the picture.

IBM says Power is zero planned downtime for system maintenance, with live updates orchestrated end to end.*

Recover from a copy nothing can change.

IBM Power Cyber Vault creates prescriptive, immutable, air-gapped copies of data to help protect against ransomware, in IBM’s words.

* IBM’s claim for Power, based upon IBM internal testing of system upgrade scenarios. IBM says many updates (VIOS, hot plug adapters, I/O adapter firmware and concurrent system firmware updates) can be done in place, while some (non-concurrent system firmware and hardware maintenance) may require Live Partition Mobility (LPM) support.

Source: IBM’s Power page, modified October 15, 2026.

Three of IBM’s own figures.

Power11 in three of IBM's figuresUp to 256 Power11 cores and 64 TB of DDR5 memory in the Power E1180. Up to 120 Power11 cores and 16 TB of DDR5 memory in the 4U Power E1150. 2x the core performance of a Power S914 in the Power S1112, and 3x a Power S814, from published CPW results comparing 4-core systems, valid as of July 14, 2026.256Power11 cores and 64 TB of DDR5memoryThe maximum for the Power E1180,a full-rack server.120Power11 cores and 16 TB of DDR5memory, in 4UThe maximum for the Power E1150.2xthe core performance of a PowerS914, in the Power S1112And 3x a Power S814. IBM's publishedCPW results comparing 4-core systems,valid as of July 14, 2026.FULL RACK4U2UIBM's figures and conditions, from ibm.com/products/power-e1180, power-e1150 and power-s1112 (pages dated October 16, 2026, read October 23, 2026).
Power11 in three of IBM's figuresUp to 256 Power11 cores and 64 TB of DDR5 memory in the Power E1180. Up to 120 Power11 cores and 16 TB of DDR5 memory in the 4U Power E1150. 2x the core performance of a Power S914 in the Power S1112, and 3x a Power S814, from published CPW results comparing 4-core systems, valid as of July 14, 2026.256Power11 cores and 64 TB of DDR5memoryThe maximum for the Power E1180, afull-rack server.120Power11 cores and 16 TB of DDR5memory, in 4UThe maximum for the Power E1150.2xthe core performance of a PowerS914, in the Power S1112And 3x a Power S814. IBM's published CPWresults comparing 4-core systems, valid asof July 14, 2026.IBM's figures and conditions, fromibm.com/products/power-e1180, power-e1150and power-s1112 (pages dated October 16,2026, read October 23, 2026).
Three of IBM’s own figures for Power11, each with its condition.

Up to 256 Power11 cores and 64 TB of memory.

IBM’s figures for the Power E1180, a full-rack server for the largest and most complex mission-critical workloads.

Up to 120 cores and 16 TB of memory in 4U.

IBM’s figures for the Power E1150, a 4U server built for memory- and data-intensive workloads.

2x the core performance of a Power S914.

IBM’s figure for the entry Power S1112, and 3x that of a Power S814. IBM bases both on published CPW results comparing 4-core systems, valid as of July 14, 2026.

Source: IBM’s Power page, modified October 15, 2026.

Pick the size that fits.

Which Power11 server fitsThe five Power11 servers, what each is for and the most it holds, as IBM states it: Power S1112, 2U rack or tower, remote, branch and near-edge sites, up to 512 GB of memory; Power S1122, 2U, small to midsized businesses and space-constrained sites, up to 60 cores and 4 TB of memory; Power S1124, 4U, enterprises and regional data centers, up to 60 cores and 8 TB; Power E1150, 4U, memory- and data-intensive workloads, up to 120 cores and 16 TB; Power E1180, a full rack, the largest and most complex mission-critical workloads, up to 256 cores and 64 TB.Power S11122URemote, branch andnear-edge sites;rack or towerUp to 512 GBPower S11222USmall to midsizedbusinesses andspace-constrained sites60 cores · 4 TBPower S11244UEnterprises andregional data centers60 cores · 8 TBPower E11504UMemory- anddata-intensiveworkloads120 cores · 16 TBPower E1180RACKThe largest and mostcomplex mission-criticalworkloads256 cores · 64 TBCores and memory are the most each server holds, as IBM states it; IBM gives memory, not cores, for the Power S1112. 2U and 4U are the server's height in therack; the Power E1180 is a full-rack server. Source: ibm.com/power and IBM's five server pages, dated October 15 and 16, 2026, read October 23, 2026.
Which Power11 server fitsThe five Power11 servers, what each is for and the most it holds, as IBM states it: Power S1112, 2U rack or tower, remote, branch and near-edge sites, up to 512 GB of memory; Power S1122, 2U, small to midsized businesses and space-constrained sites, up to 60 cores and 4 TB of memory; Power S1124, 4U, enterprises and regional data centers, up to 60 cores and 8 TB; Power E1150, 4U, memory- and data-intensive workloads, up to 120 cores and 16 TB; Power E1180, a full rack, the largest and most complex mission-critical workloads, up to 256 cores and 64 TB.Power S11122URemote, branch and near-edge sites; rackor towerUp to 512 GBPower S11222USmall to midsized businesses andspace-constrained sites60 cores · 4 TBPower S11244UEnterprises and regional data centers60 cores · 8 TBPower E11504UMemory- and data-intensive workloads120 cores · 16 TBPower E1180RACKThe largest and most complexmission-critical workloads256 cores · 64 TBCores and memory are the most each serverholds, as IBM states it; IBM gives memory, notcores, for the Power S1112. 2U and 4U are theserver's height in the rack; the Power E1180 isa full-rack server. Source: ibm.com/power andIBM's five server pages, dated October 15 and16, 2026, read October 23, 2026.
Five Power11 servers, from the 2U Power S1112 to the full-rack Power E1180.

Five Power11 servers. The Power S1112, 2U rack or tower, for remote, branch and near-edge sites. The 2U Power S1122 and the 4U Power S1124, up to 60 cores each. The 4U Power E1150, up to 120 cores. The full-rack Power E1180, up to 256 cores.

Source: IBM’s Power page, modified October 15, 2026.

What you get.

If you run infrastructure.

You get servers sized to the partitions you run, from one 2U Power S1122 to a full-rack Power E1180, and live updates IBM designed for zero planned downtime.* Our engineering team stays with you through cutover.

If you run IBM i.

You get a software tier that fits. IBM supports IBM i on the Power S1112 within the P05 tier, up to 4 cores and 64 GB of memory, with the rest of the server free for AIX, Linux and AI.

If you own security and compliance.

You get what IBM calls quantum-safe compliance management: secure boot, a cryptographic inventory and hardware-based encryption tools. And immutable, air-gapped copies of your data with IBM Power Cyber Vault.

If you are the CIO.

You get one server family for IBM i, AIX and Linux, and an AIX roadmap and support plan IBM says extends beyond 2035. Pay only for what you need. See your price first, within one business day.

You have real choices. Here is each one, plainly.

Keep the servers you have.

Nothing to buy. Nothing to move. What Power11 adds will still be here when you are ready.

Buy from IBM itself.

IBM sells directly to fewer than about 100 companies and organizations in the United States. Everyone else buys through an IBM Business Partner. So the real choice is which partner.

Buy through another IBM Business Partner.

Same IBM servers. Same IBM programs. Ask three things: who sizes the partitions, how soon you see the price, and who is with you at cutover.

Move the work to a different server platform.

Right when your applications already run there and none of them needs IBM i or AIX. Compare three things: planned downtime for maintenance, immutable copies of your data, and the operating systems you keep.

Run Power in IBM’s cloud.

Right for backup, warm disaster recovery, and development and testing, the uses IBM names for IBM Power Virtual Server. Ask us which of your partitions belong there.

Buy it through us.

You get the same IBM servers. And you get our engineering team: we size them with you, show you your price first, and stay with you through cutover.

IBM builds the servers. We size them with you.

You see your price first.

Tell us what you’re after. One business day later you have a price, sized to fit, with nothing in it you don’t need.

Our engineering team owns it.

The engineers who size it set it up and stay through support. IBM Business Partner since 2008, 29 of 29 IBM proficiencies, one team the whole way.

It is our pleasure to meet you.

230 briefing centers in 113 cities. Pick one; one of our engineers brings the coffee. Or meet us online.

Our engineering team sizes the cores, memory and partitions to the IBM i, AIX and Linux work you run, shows you your price before you commit, and stays through installation and support.

It would be our pleasure to size yours.

How our engineering team delivers

How our engineering team deliversFour steps on one line: size it, quote it, set it up, support it. Our engineering team does all four, and you see the price within one business day.01Size itWe size it with you andlicense it correctly.02Quote itYou see the pricewithin one business day.03Set it upWe set it up and staywith you through cutover.04Support itFrom sizing to support,our engineers stay with you.ONE BUSINESS DAYOUR ENGINEERING TEAM
How our engineering team deliversFour steps on one line: size it, quote it, set it up, support it. Our engineering team does all four, and you see the price within one business day.ONE BUSINESS DAYOUR ENGINEERING TEAM01Size itWe size it with you andlicense it correctly.02Quote itYou see the pricewithin one business day.03Set it upWe set it up and staywith you through cutover.04Support itFrom sizing to support,our engineers stay with you.
One of our engineers sizes your IBM solution with you, licenses it correctly, and you see the price within one business day. The same engineering team sets it up and stays with you through cutover.

Get it running.

Our engineering team, with IBM Expert Labs (formerly IBM Lab Services)

Build.

We design it, install it and move your workloads across, then hand it over working.

Stay connected.

After go-live, IBM’s specialists stay on call beside our engineering team.

One statement of work and one invoice, from us.

One of our engineers replies within one business day.

How our services work

The proof.

IBM’s published results

6 systemson Power10 run all of its SAP solutions, over 500 virtual servers.Pfizer
Up to 75%more performance for the same SAP workload on Power10, against POWER9.Bosch
30 hours to 6for a monthly regulatory billing report on Power10, with SAP HANA 2.0.Ecogas

Source: IBM’s Power page, modified October 15, 2026.

Our trusted and valued customers are shown on our home page. It is our privilege to work for them. See our customers

We would rather tell you now. Power is not the fit if your Power servers are recent and under IBM support for years to come, if everything you run already lives in a public cloud and will stay there, or if your estate is Linux alone and you want it on the fewest servers. For that last one, ask us about IBM LinuxONE.

Pay only for what you need. See your price first, within one business day.

One of our engineers replies within one business day.

See IBM in a whole new light.

AI, automation, data and security, made simple by First Light.

All of IBM. None of the fog.

One team sizes it, licenses it, sets it up and supports it.

IBM muscle. First Light hustle.

Enterprise technology, with your quote in one business day.

Give AI the night shift. You take the sunrise.

Build your first IBM watsonx Orchestrate agent on a free 30-day trial.

Trial by sunrise, not by fire.

Most IBM software starts with a 30-day trial and an engineer at your side.

Let Bob write the code. You take the sunrise.

IBM Bob is your AI engineering partner. Try it free for 30 days.

See your price